Pro23
3D model made in Foran.
Area of responsibility:
Forward part of vessel below Main deck (Engine room, Bow thruster room, Separator room, …) and Casing.
Scope of work:
- 3D model of Piping systems, Foundations and Steel outfitting
- Equipment and Electrical cabinets placing in 3D model
- Isometric drawings for modeled Piping systems
- Pipe arrangement drawings
- Pipe penetration drawings
- Foundation and Steel outfitting drawings
B702
3D model made in Foran.
Area of responsibility:
Forward part of vessel (Engine room, Bow thruster room, Gas bottle room, Separator rooms,…) including Superstructure and Casing.
Scope of work:
- 3D model of Piping systems
- 3D coordination of Equipment and Steel outfitting
- 3D model and drawings for Steel outfitting in Casing
- Layout drawings
- Isometric drawings for modeled Piping systems
- Tank arrangements and Pipe penetration drawings
- Pipe arrangement drawings including aftship
B726&727
3D model made in Foran.
Area of responsibility:
Forward part of vessel (Engine room, Bow thruster room,…) including Superstructure and Casing.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting, Steel insulation, Wall panels and Ceiling
- 3D coordination for Cable trays and Electrical equipment
- Layout and Arrangement drawings
- Isometric drawings for modeled Piping systems
- Pipe arrangement drawings
- Foundation arrangement drawings
- Coordination and Penetration plans in Superstructure
- Revision of piping system diagrams
B705
3D model made in Foran.
Area of responsibility:
Forward part of vessel (Engine room, Bow thruster room, Electrical rooms,…) including Superstructure and Casing.
Partial responsibility in aftship area (Winch room/store, Trafo/converter room, Propulsion room, Fluid & piping room, Main deck area, Moonpool area,…)
Scope of work:
- 3D model of Piping systems, Equipment, Steel outfitting, Steel insulation
- Cable trays, Wall panels, Floors, Ceiling
- Layout and Arrangement drawings
- Isometric drawings for modeled Piping systems
- Pipe arrangement drawings
- Coordination of Foundation drawings, Steel outfitting drawings
- Coordination in Superstructure and Penetration arrangement drawings
B152
3D model made in Foran.
Area of responsibility:
Forward part of vessel below Main deck (Engine room, Bow thruster room,…) and Casing.
Scope of work:
- 3D model of several Piping systems, Equipment and Foundations
- Isometric drawings for modeled Piping systems
B701
3D model made in Foran.
Area of responsibility:
Forward part of vessel below Main deck (Engine room, Bow thruster room,…) including Diving support area.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations
- Isometric drawings for modeled Piping systems
- Arrangement drawings
- Pipe arrangement drawings
- Foundation arrangement drawings
B154
3D model made in Foran.
Area of responsibility:
Forward part of vessel below Main deck (Engine rooms, Bow thruster rooms, Separator rooms, ROV winch rooms, Electrical rooms,…) and Casing.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations
- Isometric drawings for modeled Piping systems
- Arrangement drawings
- Pipe arrangement drawings
- Pipe penetration arrangement drawings
- Foundation arrangement drawings
B703&B716
3D model made in Foran.
Area of responsibility:
Forward part of vessel (Engine room, Bow thruster room, ROV hangars, workshops,…), Casing and Superstructure.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Vent. ducts, cable
- trays and part of Steel outfitting
- Isometric drawings for modeled Piping systems
- Layout drawings
- Arrangement drawings
- Pipe arrangement drawings
- Foundation arrangement drawings
Simek 121
3D model made in Foran.
Scope of work:
- 3D model of piping systems in Engine room and Casing
- Pipe arrangement drawings of areas in whole vessel
B728
3D model made in Foran.
Area of responsibility:
Forward part of vessel (Engine room, Bow thruster room,…), Casing and Superstructure.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting and
- Vent. ducts
- Isometric drawings for modeled Piping systems
- Arrangement drawings
- Pipe arrangement drawings
- Foundation arrangement drawings
- Coordination plans in Superstructure
- Penetration plans in Superstructure
- 3D coordination of Electrical equipment and Cable trays
B718
3D model made in Foran.
Project was based on previous project 705. Changes and adjustments had to be done due to changed Piping systems, Equipment and arrangements.
Area of responsibility:
Forward part of vessel below Main deck (Engine rooms, Bow thruster rooms, Winch rooms, Electrical rooms,…) and Casing.
Scope of work:
- 3D coordination of differences between project 718 and 705 (reference project)
- 3D model of Piping systems and Equipment
- Isometric drawings for modeled Piping systems
- Arrangement drawings
B730
3D model made in Foran.
Area of responsibility:
Forward part of vessel (Engine rooms, Bow thruster rooms, ROV winch rooms, Electrical rooms, Separator rooms,…), Casing and Superstructure.
Scope of work:
- 3D model of Piping systems, Equipment and some Foundations and Steel
- outfitting
- Isometric drawings for modeled Piping systems
- Layout drawings
- Arrangement drawings
- Pipe arrangement drawings
- Pipe penetration arrangement drawings
- Foundation arrangement drawings
- 3D coordination of Foundations and Steel outfitting
B771
3D model made in Foran.
Project was based on previous project 152.
Some changes and adjustments had to be done on piping systems, equipment and arrangements due to new owner requests.
Area of responsibility:
Forward part of vessel (Engine rooms, Bow thruster rooms, Electrical rooms,…), and Superstructure.
Scope of work:
- 3D model of Piping systems, Equipment, Steel insulation, Wall panels
- Ceiling panels,…
- Coordination plans in Superstructure
- Penetration plans in Superstructure
B830
3D model made in AVEVA.
Area of responsibility:
Forward part of vessel below Main deck (Engine rooms, Bow thruster rooms, Ship system rooms, Electrical rooms,…) and Casing.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting, Steel
- insulation, Vent. ducts, Free holes,…
- Isometric drawings for modeled Piping systems
- Layout drawings
- Arrangement drawings
- Foundation drawings
- Steel outfitting drawings
- Pipe arrangement drawings
- Pipe penetration arrangement drawings
- Proposals for revising of piping system diagrams
B823
3D model made in AVEVA.
Area of responsibility:
Forward part of vessel (Engine rooms, Bow thruster rooms, Electrical rooms,…), Casing and Superstructure.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting, Steel
- insulation, Vent. ducts, Free holes,…
- Isometric drawings for modeled Piping systems
- Arrangement drawings
- Foundation drawings
- Steel outfitting drawings
- Pipe penetration arrangement drawings
- Coordination plans in Superstructure
- Penetration plans in Superstructure
- Vent. ducts arrangement drawings
- Proposals for revising of piping system diagrams
B800
3D model made in AVEVA.
Area of responsibility:
Forward part of vessel (Engine rooms, Bow thruster rooms, Ship system rooms, Winch rooms, Electrical rooms,…), Casing and Superstructure.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting, Steel
insulation, Vent. ducts, Free holes,…
- Isometric drawings for modeled Piping systems
- Layout drawings
- Arrangement drawings
- Foundation drawings
- Steel outfitting drawings
- Pipe arrangement drawings
- Pipe penetration arrangement drawings
- Coordination plans in Superstructure
- Penetration plans in Superstructure
- Proposals for revising of piping system diagrams
- Proposals for changes in Steel
B811
3D model made in AVEVA.
Area of responsibility:
Forward part of vessel below Main deck (Engine rooms, Bow thruster rooms, Ship system rooms, Winch room, Electrical rooms,…), Casing and ROV hangar.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting, Vent.
ducts, Free holes,…
- Isometric drawings for modeled Piping systems
- Arrangement drawings
- Foundation drawings
- Steel outfitting drawings
- Pipe arrangement drawings
- Pipe penetration arrangement drawings
- Proposals for revising of piping system diagrams
Simek129
3D model made in Foran.
Area of responsibility:
Forward part of vessel below Main deck (Engine room, Bow thruster room,…) and Casing.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting, Vent.
ducts,…
- Isometric drawings for modeled Piping systems
- Layout drawings
- Arrangement drawings
- Foundation drawings
- Proposals for revising of piping system diagrams
B799
3D model made in AVEVA.
Area of responsibility:
Forward part of vessel except for Accommodation area above A-deck (Engine room, Bow thruster room, Winch area, Main deck, A-deck, open decks) and Casing.
Scope of work:
- 3D model of Piping systems, Equipment, Foundations, Steel outfitting, Vent ducts, Free holes,…
- Isometric drawings for modeled Piping systems
- Layout drawings
- Arrangement drawings
- Foundation drawings
- Steel outfitting drawings
- Coordination plans in Superstructure
- Penetration plans in Superstructure
- Some arrangement drawings in Aftship
- Coordination and proposals for revising of piping system diagrams
- Proposals for changes in Steel
- Pressure drop calculations for Exhaust piping
- 3D coordination of Foundations and Steel outfitting made by third party
- Coordination of Arrangement, Foundation and Steel outfitting drawings made by third party
Projects
(move your mouse over an image to see project details.)
tel +385 51 555-557
fax +385 51 555-559
Milutina Barača 7
51000 Rijeka · Croatia
Vertex BS d.o.o.
Marine engineering & Consulting
2014 © Vertex BS. All right reserved.